Capability:
Wharves
Location:
Sacramento, California
Client:
Manson Construction

Cemex West Sacramento Cement Import Terminal

Design of a 550-foot wharf, including piles, fendering, mooring systems, access bridge, and embankment for a new cement import facility

One of the world’s leading suppliers of cement and concrete for construction, Cemex, needed a new wharf as part of its cement import terminal in West Sacramento, where a cement unloader would service a berthed cement laden vessel. Liftech joined a design-build team with Manson Construction, taking on full wharf design for a structure that had to perform reliably under both operational and seismic loads.

The Challenge

The site's relatively low seismicity created an unusual condition where the vessel broadside berthing forces, rather than earthquake loads, threatened to drive up the pile count and overall project cost. The cement unloader added further complexity. Its multiple modes of vibration and large mass meant a standard structural analysis wouldn't accurately capture its effect on the wharf's seismic behavior.

Our Approach

Liftech designed the wharf so that half of the fenders were recessed and only half would load the wharf during a broadside berthing. This resulted in a dramatic reduction in the number of piles compared to the competing design-build team. This in turn reduced the wharf’s lateral stiffness, increasing its period of vibration, and reduced its earthquake loading. Liftech designed the entire wharf superstructure as a slab without crane girders, delivering further cost savings. To address the unloader's seismic influence, Liftech performed a novel dynamic analysis of the combined wharf and unloader structure to accurately design for the unloader forces and provide useful earthquake design guidance to the unloader manufacturer.

project details
Year completed
2007
location
Sacramento, California
client
Manson Construction
services provided
Crane Design
Design-build
Seismic Design
Structural Engineering

Project Images

No items found.
client testimonial

As Project Director for Manson on the Cemex Dock in West Sacramento I found the Liftech staff very accommodating in trying to design around our constructability plans. There are a lot of structural engineers that we could have selected, but for this project Liftech seemed to offer Manson the best working approach.

–
- Bill Cooke, Project Director (Retired), Manson Construction