Therasense Phase Two

Liftech designed the structure for a 64,000-square-foot office, manufacturing, and warehouse facility in Alameda, California. The building has steel concentric braced frames, steel roof and floor framing, a metal deck with concrete floor, and a metal deck roof. The foundation system is conventional spread footings. The lobby features a two-story open space, and the architectural design exposes the braced frames.

Reference:
Jones Development Company
Oakland, California, USA