Category: Crane Maintenance Projects

Bauxite Unloader Study

Two bauxite unloaders of identical design have been operating for over 50 years. The operator wished to continue operations for another 15 years. Liftech analyzed the crane structure to assess the fatigue life for continued operations.

YICT Crane Structural Maintenance

YICT operates three Mitsubishi, three ZPMC, seven Mitsui, and two Hyundai cranes at their Yantian terminal facility. The cranes had not previously been inspected using NDT techniques such as MT or UT. Liftech performed a useful life assessment, developed a comprehensive structural maintenance program, and prepared NDT inspection manuals.