Bauxite Unloader Structural Condition Survey

A bauxite unloader has been operating at a bauxite refinery facility in South America since it was built in 1983.

Liftech performed a structural condition survey of the unloader structure and presented significant findings and recommendations in the structural assessment report.

Liftech identified cracks in the boom and other critical members during the observations and assisted with emergency repairs of the boom so the unloader could resume operation.

Client:
McKay International Engineers
Benicia, California, USA

Owner:
Confidential