SSA Mexico Paceco Crane Gage Change and Relocation

SSA Mexico relocated a 50’ gage Paceco crane from the Port of Long Beach, California, to Manzanillo, Mexico.

The crane was built around 1980 and was raised in the late 1980s. Liftech provided engineering to change the gage from 50’ to 55’ and for the associated rigging work. The frame was strengthened for higher wind loads, and new stowage brackets and tie-downs were added.

Reference:
SSA Mexico
Manzanillo, Colima, Mexico