A damaged pier at McNear’s Beach Park in Marin, California, was repaired by replacing portions with new structure. The new structure was designed to meet current seismic design criteria. This required a high performance pile-to-pile cap connection. The high performance connection was designed using a fiber reinforced bearing pad, isolating the sides of the...
Read more »

